Harju maakond, Tallinn, Lasnamäe linnaosa, Mäe tn 2b
Identity
Official sourcesChecked Aug 25, 2026Effective Mar 11, 2026Official addresses
- Harju maakond, Tallinn, Lasnamäe linnaosa, Mäe tn 2b
Primary use Multi-apartment residential
Official identifiers
ads:tunnus120796187ehr:ehr_code120796187ads:ads_oidEE03569812
Building facts
Official sourcesChecked Aug 25, 2026Effective Mar 11, 2026What this building is
6 fields published
- Name in the registerKorterelamu
- Building statusExisting
- Primary useOther residential building with three or more apartments
- Use purposeOffice building
- Use purposeOther residential building with three or more apartments
- Official addressHarju maakond, Tallinn, Lasnamäe linnaosa, Mäe tn 2 // 2a // 2b
Dates
1 field published
- First use2018
Show the 2 fields this source does not publish
- Construction startedThis source does not publish this information.
- Planned commissioningThis source does not publish this information.
Size and layout
6 fields published
- Floors above ground8
- Floors below ground1
- Building height29 m
- Closed net area10,127.5 m²
- Heated area3,511 m²
- Footprint area2,065.8 m²
Show the 3 fields this source does not publish
- RoomsThis source does not publish this information.
- Non-residential unitsThis source does not publish this information.
- LiftsThis source does not publish this information.
Energy performance
4 fields published
- Energy classB
- Certificate issuedMar 10, 2026
- Certificate valid untilMar 10, 2036
- Energy certificate2611584/00770
Heating and electricity
7 fields published
- Heat supplyDistrict heating
- Heat supplyLocal heating (building's own heat source)
- Heat sourceHeat pump
- Heat sourceDistrict heating
- Energy carrierAir-source heat + electricity
- Electrical systemSolar-powered
- Electrical systemMains (public network)
Show the 4 fields this source does not publish
- Heating typeThis source does not publish this information.
- Heating systemThis source does not publish this information.
- Electricity supplyThis source does not publish this information.
- Electric cookerThis source does not publish this information.
Ventilation and cooling
2 fields published
- VentilationMechanical supply and extract
- VentilationVentilation with heat recovery
Show the 2 fields this source does not publish
- Cooling systemThis source does not publish this information.
- Cooling sourceThis source does not publish this information.
Water, sewerage and gas
2 fields published
- Water supplyMains (public network)
- SewerageMains (public network)
Show the 6 fields this source does not publish
- Hot waterThis source does not publish this information.
- Gas supplyThis source does not publish this information.
- Gas installationThis source does not publish this information.
- Household gasThis source does not publish this information.
- Washing facilitiesThis source does not publish this information.
- ToiletThis source does not publish this information.
Structure and materials
13 fields published
- FoundationOther
- Load-bearing structureSmall or large block, e.g. foam, aerated, LECA, concrete
- Load-bearing structurePrecast reinforced concrete
- Load-bearing structureCast-in-place reinforced concrete
- External wallSmall or large block (foam, aerated, LECA, concrete)
- External wallConcrete
- Facade finishWood (cladding boards)
- Facade finishConcrete
- Intermediate floorsPrecast reinforced concrete
- Intermediate floorsCast-in-place reinforced concrete
- Roof structureCast-in-place reinforced concrete
- Roof structurePrecast reinforced concrete
- Roof coveringBitumen or PVC sheet or roll roofing
Heritage protection
No fields published
Show the 2 fields this source does not publish
- Heritage statusThis source does not publish this information.
- Heritage categoryThis source does not publish this information.
Permit and document timeline
Official sourcesHapito has not imported this yet.
Project parties
Official sourcesHapito has not imported this yet.
Resident experience
Resident evidenceNo resident evidence has been published for this building yet.
Eligible resident responses for this building so far: 0. Hapito publishes resident evidence only once enough eligible responses exist under the active policy, so an empty section reflects Hapito's coverage, never the building's condition.
Defects and handling
Resident evidenceNo defect threads have been published for this building yet. That reflects what has been published on Hapito, not the building's condition.
Buyer checklist
Derived by HapitoThe buyer checklist turns this report's facts, gaps and conflicts into questions worth asking before you buy. It supports your own investigation and is not legal or engineering advice.
Request and contribute
Request this report
Asking records one anonymous request signal for this building. It does not change the report content, and nobody can see how many people asked.
Contribute resident experience
Answering the resident survey adds your observations to this building's anonymous resident aggregate once enough eligible responses arrive.
Open the resident survey